Yzvm.com

Film Blowing Machine/Three-Layer Co-Extrusion HDPE/LDPE/LLDPE/PE Plastic Film Blowing ...

BEHAPPY CRAFTS (SUZHOU) CO., LTD.

Base Info

Description


Type
F3B-RD-1300
F3B-RD-1600
F3B-RD- 1800
F3B-RD- 2200
Diameter of screw
1200
1500
1700
 2000
L/D30:130:130:130:1
Film thickness (mm)
0.02-0.1
0.02-0.1
0.02-0.1
0.02-0.1
Max. output (kg/h)
120
150
170
220
Raw material
MLLDPELLDPELDPEEVA
Screw diameter (mm)
45/55/45
50/60/50
55/65/55
70/85/70
Screw L/D ratio L/D
30:1
30:1
30:1
30:1
Screw Max. rotation Speed (r/min)
10-100
10-100
10-100
10-100
Extruder driving power (kw)
15/22/15
18.5/30/18.5
22/30/22
37/55/37
The way of esteem changing of extruder
 
Manual twin-station changing screen quickly
Die structure
IBC(option device)
With or without IBC(Internal Bubble Cooling system) option device)
Air-ring structure
 double air vent air ring
Reversting haul-off system
Film turning mode
 
Horizontal
Angle of reversing
±360
Total Power (kw)
120
140
160
200
Overall dimensions (m)
9.5*5*9
10*5.5*9.5
10*6*10.5
10.5*7*11
Weight (T)
12
14
16Machine Pictures for Reference:
Film Blowing Machine/Three-Layer Co-Extrusion HDPE/LDPE/LLDPE/PE Plastic Film Blowing MachineryFilm Blowing Machine/Three-Layer Co-Extrusion HDPE/LDPE/LLDPE/PE Plastic Film Blowing Machinery
Film Blowing Machine/Three-Layer Co-Extrusion HDPE/LDPE/LLDPE/PE Plastic Film Blowing MachineryWorkshop of HOIN
High Speed PE Film Blowing Machine for HDPE LDPE LLDPEHigh Speed PE Film Blowing Machine for HDPE LDPE LLDPEHigh Speed PE Film Blowing Machine for HDPE LDPE LLDPE
More Products Optional
High Speed PE Film Blowing Machine for HDPE LDPE LLDPEAfter Service of HOIN
1. How long will your engineer reach to our factory?
Within one week after machine arrival at your factory.
2. How many days will you finish installing?
We will finish installation and training within 15days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also their salary 100USDper day per person.
4. How long of your machine's warranty period?
Our machines have one year guarantee after finishing installation under normal operation.
5. How could we do after one year warranty period?
We will still offer you our best after service, of course you will afford our technician's cost.
6. How could we do if the parts broken within of after warranty?
We will express the free replacement parts during the warranty date and also send you parts needed by value after warranty.
7. Does your engineer understand English?
Our engineers understand a little English. All of our engineers have rich experience for installingmachines over seven years. In addition, they also can communicate with you using their body language vividly.
8. Can you find us any engineer in our location?
Of course, we will check and inform you as soon as possible.