Yzvm.com

Mining Hydraulic Crawler Rock Quarry Gold Mine Blasting Hole Drilling Rig D100ya2-2

Wenzhou Daba Machinery Co., Ltd.

Base Info

Description

Bore diameter(mm)

90-130

Bore depth(m)

30

Walk speed(km/h)

2

Once promotion(mm)

2000

Grade ability (°)

30

Air pressure(Mpa)

0.7-1.4

Chassis ground clearance(mm)

260

Air consumption(m³/min)

7-15

Skid pitch(°)

100

Host Power (Kw)

33

Skid tilt swing (°)

L35,R10

For rock(F)

6-20

Skid compensation(mm)

900

Dimension(L*W*H)(mm)

4300*2130*2160

Weight(Kg)

2900


       D100YA2-2Fcrawler hydraulic drilling rig, adopts new type hydraulic rotary motor, hashigh rotary speed, large torque and low failure rate. This rig has low airconsumption, convenient for shifting holes, uses air filter and oil filtertotalthree-stage filters to reduceengine wearing , increase working life of the diesel engine. The rig structureis compact, the minimum moving radius is 2.8m, and the skid mast has compensationfunction. when drilling, the skid mast supported on the ground that guarantee gooddrilling stability.

The drilling rig is mainly capable for open mining, water conservancy, power plants, roadbuilding and other rock blasting holes drilling .


Mining Hydraulic Crawler Rock Quarry Gold Mine Blasting Hole Drilling Rig D100ya2-2
Mining Hydraulic Crawler Rock Quarry Gold Mine Blasting Hole Drilling Rig D100ya2-2

Mining Hydraulic Crawler Rock Quarry Gold Mine Blasting Hole Drilling Rig D100ya2-2Mining Hydraulic Crawler Rock Quarry Gold Mine Blasting Hole Drilling Rig D100ya2-2Mining Hydraulic Crawler Rock Quarry Gold Mine Blasting Hole Drilling Rig D100ya2-2Mining Hydraulic Crawler Rock Quarry Gold Mine Blasting Hole Drilling Rig D100ya2-2Mining Hydraulic Crawler Rock Quarry Gold Mine Blasting Hole Drilling Rig D100ya2-2Mining Hydraulic Crawler Rock Quarry Gold Mine Blasting Hole Drilling Rig D100ya2-2Mining Hydraulic Crawler Rock Quarry Gold Mine Blasting Hole Drilling Rig D100ya2-2Mining Hydraulic Crawler Rock Quarry Gold Mine Blasting Hole Drilling Rig D100ya2-2Mining Hydraulic Crawler Rock Quarry Gold Mine Blasting Hole Drilling Rig D100ya2-2

R F Q:

1.   The payment terms: Pay 30% deposit in advance by T/T firstly, then pay the balance70% before delivering the products.

2.   The time of delivery: Deliver the products within 2 days after receiving the total price.

3.   The quotation validity date:40 days;  Machine manufacturing time: 10 days; 

4.   About our company: We are factory, our factory(company) is at TaiAn city,ShanDong, China.
      We also have our own export company.