
Rotary Die Head Double Frication Winder Film Blowing Machine
BEHAPPY CRAFTS (SUZHOU) CO., LTD.Base Info
Description
Basic Info.
Model NO. FB-A-600 Automation Automatic Computerized Computerized Machine Weight 3000kgs Certification CE, ISO9001:2008 Suitable Material LDPE/HDPE/LLDPE Output 40kg/H Die Size 80 and 120mm Transport Package Wooden Package Specification 4200*2000*4200 Trademark HOIN Origin Ruian, Zhejiang, China HS Code 8477309000 Production Capacity 30 Sets/One MonthProduct Description
FB-A-600 PE Film Blowing Machine
1.Technology Parameter:
Model | FB-A600 |
Screw Diameter | 50MM |
Screw Ratio | L/D28:1 |
Screw Speed | 10-100r/min |
Power of Main Motor | 11KW |
Power of traction main motor | 1.5kw |
Main Output | 40kg/h |
Max.Folding Width of Film | 100-600mm |
Single-sided Thickness of Film | 0.008-0.10mm |
Overall Dimensions | 5600x2000x4200mm |
Suitable Material: HDPE/LDPE/LLDPE
Max.Folding Width of Film (mm): 600
Thickness of Film (mm): 0.008-0.10MM
Max. Output (Kg/Hr.): 40kg/h
Extruder
Screw Dia. (mm): φ 50
Screw & Barrel L/D Ratio: 28: 1
Screw & Barrel material: 38 CRMOALA
Barrel Auto Thermo Control: 3 Points
Cooling Blower : 1.1kw
Gear box: water cooling reducer, hard tooth surface use 133# type
Driving Motor: 11kw
Screen Changer: manual type
Screen Changer Heater Capacity (Kw): 1.5
Die:
Die Dia. (mm): 80mm and 120mm
Die Heater Capacity (Kw): 3
Die Auto Thermo Control: 1 Points
Air Ring: 1 Set per Die
Bubble Basket: Hexagon Type
Folding devices ( from the double sides ) ,
max.folding : The 10cm
Take-up Unit:
To be possible to moving the tower 1.5m
Pinch Roller- Embrorosing Roller
Take-up Motor with Inverter Control: AC 1.5kw
Winding Unit
Max. Width (mm): 600
Max. Wind-up roll dia. (mm): φ 800
Winding Motor: 10Kg/Nm with moment motor
Rewinding Speed: 5-50m/min
3.Spare Part List:
01 | filter | 1 M | 08 | electric -testing pen | 1 pcs |
02 | magetic stone | 1 pcs | 09 | hexageonic wrench | 1 pcs |
03 | air pipe | 1 pcs | 10 | glove | 2 pairs |
04 | 8-10 open and wrench | 1 pcs | 11 | Steady Bar | 1 pcs |
05 | 12-14 open and wrench | 1 pcs | 12 | Mould Pipe | 1 pcs |
06 | 14-17 open and wrench | 1 pcs | 13 | electric-thermal couple (E) | 2 pcs |
07 | 17-19open and wrench | 1 pcs | 14 | screw heater(stainless steel) | 1 pcs |





1. How long will your engineer reach to our factory?
Within one week after machine arrival at your factory.
2. How many days will you finish installing?
We will finish installation and training within 15days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also their salary 100USD per day per person.
4. How long of your machine's warranty period?
Our machines have one year guarantee after finishing installation.
5. How could we do after one year warranty period?
We will still offer you our best after service, and need you to afford our technician's cost.
6. Can you find us any engineer in our location?
Of course, we will check and inform you as soon as possible.
Any query please feel freely to contact with us!
MS.WendyPan