
Three Layer Co-Extrusion ABC HDPE LDPE LLDPE Film Blowing Machine
Saame Tools (Shanghai) Import & Export Co., Ltd.Base Info
Description
Basic Info.
Certification CE Film Width 250-1000mm Film Thickness 0.006-0.15mm Max. Output 120kg/H Main Motor 15kw*2, 18.5kw*1 Transport Package Shrink Film or Wooden Case Specification 6.5*2.7*5 Trademark ChengHeng Origin China Production Capacity 120kg/HProduct Description
Three Layers Co-extursion Film Blowing Machine
ABC Three-Layer Co-Extrusion Line are designed developed by our corporation according to
market need. It used for blowing LDPE/HDPE/LLDPE packaging films, and it has good insulation,
for instance holding temperature, antihumid, antibreeze, anti-rain,anti-rost, insulation oxygen,oil
resistive, and so used for light and heavy-duty packaging, for example fresh fruits, meat-
feeding,salt vegetables, fresh milk, liquid drink.
Specification
Model | ABC-45-50-45/1200 | Width of the film | 250-1000mm |
Thickness of the film | 0.006-0.04mm | The Max. Output | 120kg/h |
Raw Material | HDPE/LDPE/LLDPE | Certification | CE, SGS |
Diameter of screw | 45-50-45 | Warranty | 5 years |
L/D ratio of screw | 30:1 | Rotation speed of screw | 10-120r/min |
Gear Box | 146#*2;173#*1 | Main motor | 15KW*2;18.5kw*1 |
Die diameter | Φ60mm | Bellow power | 1.5KW |
Specifications
1.The whole machine is square structure
2.Traction inverter control, host frequency conversion control, (optional fan frequency control,
winding frequency control) 100% inverter motor + frequency converter control
3.Full enclosed overtemperature cooling device
4.Brand Industrial electricity



Certificate



Packing & Delivery

Our Service
1.Inquiry and consulting support.
2. Sample testing support.
3.View our Factory.
4.Training how to instal the machine, training how to use the machine.
5.Engineers available to service machinery overseas.
FAQ
Q1. What is your terms of packing?
A: Generally, we pack our goods in shrink film.Some machinery spares packed in carton or
wooden box.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and
packages before you pay the balance.
Q3. What is your terms of delivery?
A: FOB, CFR, CIF,.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery
time depends on the items and the quantity of your order.
Q5. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q6: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with
them, no matter where they come from.