
Gd150q-S Jelly Candy Production Line (starch mogul line)
Hebei Hightop Metal Mesh Co., Ltd.- Certification:CE, ISO9001
- Automatic Grade:Automatic
- Application:Ice Cream, Candy, Chocolate
- Customized:Customized
- Capacity:150kg,H
- Depositing Speed:25-35n,Min
Base Info
- Model NO.:GD150Q-S
- Electric Power:27kw,380V
- Total Length:16m
- Max Candy Weight:as Per as Candy Size
- Room Condition:Temp20~25°c
- Transport Package:Wooden Case
- Specification:CE, ISO9001
- Trademark:TGmachine
- Origin:China
- HS Code:84382000
- Production Capacity:150kg,H
Description
Basic Info.
Model NO. GD150Q-S Electric Power 27kw/380V Total Length 16m Max Candy Weight as Per as Candy Size Room Condition Temp20~25°c Transport Package Wooden Case Specification CE, ISO9001 Trademark TGmachine Origin China HS Code 84382000 Production Capacity 150kg/HProduct Description
GD150Q-S Jelly candy production Line (starch mogul line)
FEATURES:The processing line is an advanced and continuous plant for making different sizes of gelatin-type soft candies. It is an ideal equipment which can produce out good quality products with the saving of both the manpower and the space occupied.



CANDY SAMPLES:



PROCESS FLOWING LAYOUT CHART:

TECHNICAL SPECIFICATIONS:
Model | GD150Q-S |
Production capacity ( kg/h) | 150 |
Weight of each candies(g): | As per candy size |
Electric power needed | 18kW/380v |
Refrigerator and cooler | 40,000kcal/h 18kW |
Compressed air consumption Compressed air pressure | 0.35m3/min 0.4-0.6 Mpa |
Conditions needed for the cooling system: 1.Room temperature(ºC) 2.Humidity (%) | 20~25 55 |
Length of the whole line (m) | 16m |
Gross weight ( Kgs) | Approx.4500 |
Warranty:
The seller guarantees the quality of the products for 12 months since the date of installation. During the warranty period, any problems/defaults happen on the hard parts of the machinery, the buyer will replace the parts at the seller's cost (FREE). If the defaults are aroused by the defaulted operations, or the buyer needs the technical assistance for the processing problems, the buyer should be responsible for all the cost and their allowance.
