
Sjsz-51/105 Construction Insulation Electrician Bushing Production Line/PVC Threading Pipe ...
Shandong Yikuang Drilling Technology Co., Ltd.Base Info
Description
TRADE TERMS
♦Delivery time: | 40 working days from down payment receipt |
♦ Packing: | Sea-worthy package mainly with wood pallets, film and some parts in wooden case. |
♦ Payment: | 30% as advance payment by T/T after signing contract; 70% as balance after inspection machine before delivery by T/T |
♦ Warranty: | 12 month |
♦ Validity: | 30 days |
Our company through continuous development, continuous introduction of advanced technology, improve the quality of equipment and production capacity, to ensure reliable and stable equipment at the same time, constantly improve the quality of service, to provide you with solutions to problems, so that you are satisfied, rest assured, welcome friends from all walks of life presence.





