Yzvm.com

50-200mm CPVC UPVC Pipe Manufacturing Machine

Ningbo Easyget Co., Ltd.

Base Info

Description

ModelDiameterApproximately priceProduction capacityMain extruder power51/10516-50mm30000-35000 USD80-120kg/h22kw65/13250-160mm40000-46000 USD150-240kg/h37kw80/156160-315mm65000-72000 USD300-350kg/h75kw92/188315-500mm190000-200000 USD400-500kg/h110kw
2, Product Description
The production line adopts unique mold and sizing sleeve design, which can produce PVC solid pipe continuously and stably. PVC pipe has the features of strong corrosion resistance, easy adhesion, low price and hard texture. However, due to PVC-U monomer and additive bleed, it is only suitable for supplying water that the temperature not exceeding 45 ºC. PVC pipe is widely used in water drainage, sewage water, chemicals, heating fluids and coolants, food, ultra-pure liquids, mud, gas, compressed air and vacuun m systems.
50-200mm CPVC UPVC Pipe Manufacturing Machine

3, Equipment ListNo.Equipment list for PVC pipe manufacturing plantQuantity1Mixing machine1 set2Auto feeder2 sets3Conical double screw extruder1 set4Die head and sizing moldcustomized51st  cooling tank1 set62nd  cooling tank1 set7haul off device1 set8auto cutting machine1 set9Laser printer or ink jet printer1 set10PVC pipe stacker1 set11PVC pipe joint belling machine 1 set12Crushing machine1 set13PVC powder milling machine1 set14Air compressor1 set15water chiller1 set
4, Detailed Images
50-200mm double cavity PVC pipe extrusion line,

Extruder for PVC pipe machine: conical double screw extruder
with auto screw feeder
high quality gearbox
37KW siemens motor,equip with ABB inverter
Auto Omron Temperature control
50-200mm CPVC UPVC Pipe Manufacturing Machine

die head for 50-200mm PVC pipe making
equip size parts for 50,63,75,90,110,125,140,160,180,200mm diameter
50-200mm CPVC UPVC Pipe Manufacturing Machine

 

water tank for PVC pipe machine

Quantity: two sets
length of tank: 6 meters/tank
cooling type: vacuum cooling and water cooling
50-200mm CPVC UPVC Pipe Manufacturing Machine


 

haul off for PVC pipe machine

Quantity of caterpillar: 2-4 sets of rubber caterpillar
speed control: by ABB inverter control

 

50-200mm CPVC UPVC Pipe Manufacturing Machine
 

Auto cutter for PVC pipe machine

equip with dust collection system
cutter type: simple saw cutting, or Planetary cutting .
50-200mm CPVC UPVC Pipe Manufacturing Machine
 

Product stacker

auto stacking, 6 meter length
50-200mm CPVC UPVC Pipe Manufacturing Machine
Online laser printing machine


50-200mm CPVC UPVC Pipe Manufacturing Machine
FAQ
1, DO YOU PROVIDE OEM SERVICE?
we accept OEM order to design the machine according to customer's special requirements.

2, HOW CAN I GET THE TECHNICAL PARAMETERS?
Please contact us for sending you detailed quotation with technical parameters

3, WHAT IS THE  WARRANTY TERMS?
3.1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMER'S WAREHOUSE
3.2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.
3.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.

4, WHAT IS THE DELIVERY CONDITIONS?
4.1 DELIVERY CONDITION: FOB QINGDAO PORT.
4.2 DELIVERY TERM: WITHIN 45 WORKING DAYS AFTER RECEIPT OF  ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.
4.3 SUPERVISION OF LOADING:THE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER SHOULD ARRANGE FOR SUPERVISION OF LOADING.

5, WHAT IS THE PAYMENT TERMS?
5.1 INSTALLMENT I: 30% OF TOTAL PAYMENT TO BE PAID AT ADVANCE
5.2 INSTALLMENT II: THE BALANCE 70% OF TOTAL PAYMENT TO BE PAID BY TT OR LC AT SIGHT

6, HOW TO DO THE INSPECTION WORK BEFORE SHIPMENT?
WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST  FOR THE MACHINE INSPECTION IN SELLER'S FACTORY. THE BUYER SHOULD COME TO SELLER'S FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLER'S FACTORY TO DO THE INSPECTION WORK.

7, HOW TO DO THE INSTALLATION AND EQUIPMENT COMMISSIONING?
IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYER'S FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE, AND THE BUYER SHOULD UNDERTAKE THE WHOLE FOOD/PLACE AND ROUND TICKETS (AIRPLANE, FOOD, HOTEL, AND SO ON), AND PAY SALARY TO ENGINEER FOR 80 USD/DAY/ENGINEER.

PS: Above Items are discussable according to customer's special requirements.