
PE Double-Wall Hollow Winding Pipe Machine (SJ65/33) for The PE Pipe Making
Ningbo Zhaoke Int'l Imp. & Exp. CorpBase Info
Description
Item of Plastic PE double-wall hollow winding pipe machineSpecification
(mm) Extruder Total Power (KW)Installed(Actual Consumption 50%) Max. Output
(kg/h) Overall Dimensions(L*W*H)(m) Model L/D Ratio Main Motor Power
(KW) Heating Power
(KW) SKRG800 Dia200-800 SJ90 30: 1 75 30 230 260 10× 21.5× 2.6 SJ65 30: 1 45 18 SKRG1200 Dia400-1200 SJ90 34: 1 110 30 300 500 10× 23× 2.7 SJ65 30: 1 75 18 SKRG1500 Dia900-1500 SJ90× 30 30: 1 110 30 450 600 28× 18× 6 SJ90× 34 34: 1 110 36 SJ65× 30 30: 1 75 18 SKRG2200 Dia1200-2200 SJ120 30: 1 185 60 500 700 30× 20× 7 SJ90 34: 1 110 36 SJ65× 30 30: 1 75 18 SKRG3000 Dia2200-3000 SJ150 30: 1 280 80 650 800 32× 20× 8 SJ120 30: 1 185 60
TRADE TERMS
Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
Delivery Time: 40 days after receipt of prepayment.
Packing Method: Packing film or wooden case
Guaranteed Time: 12 months
MACHINERUNNING TEST AND AFTER SERVICE
When machine finished, we will invited client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.
When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.
If have any question or problem on machine operation or maintain, welcome to contact to us by email or calling. We stand by 24 hours.




(mm)
(kg/h)
(KW)
(KW)
TRADE TERMS
Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
Delivery Time: 40 days after receipt of prepayment.
Packing Method: Packing film or wooden case
Guaranteed Time: 12 months
MACHINERUNNING TEST AND AFTER SERVICE
When machine finished, we will invited client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.
When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.
If have any question or problem on machine operation or maintain, welcome to contact to us by email or calling. We stand by 24 hours.



