
Industrial Brewing Project 2000L / 20bbl Beer Making Machine
Jinan Jotop Import and Export Trade Co., Ltd.- Processing Material:Water,Malt,Hops,Yeast
- Application:Beer
- Customized:Customized
- Certification:CE, ISO9001, TUV
- Power Source:Electric Steam,Gas,Direct Fire
- Automatic Grade:Semi-Automatic
Base Info
- Model NO.:MT-1000L
- Material:SUS304 Stainless Steel
- Cooling Unit:Chiller with Glycol Tank
- Control Unit:Temp. Controller, HMI, PLC or Touching Screen
- Thickness:Inner Wallet 3mm, Outer Wallet 2mm
- Voltage:220V,380V
- Dimension(L*W*H):Depending on Capacity
- Weight:Depending on Capacity
- Welding:Arc Argon Protection
- Warranty:3 Years for Tank
- Insulation:Polyurethane Foam
- Polish Finish:0.4-0.6UM
- Brewhouse Heating:Steam Jacket , Electric Tube, Direct Fire
- Technology:Offer Auto CAD and 3D Design Drawing
- After-Sales Service:Installation and Equipment Commission
- Capacity:2000L Beer Making Machine
- Transport Package:Plastic Film, Plywood Case; Container;
- Specification:Customized
- Trademark:METO
- Origin:Jinan, China
- HS Code:84384000
- Production Capacity:10 Set,Sets Per Month Stainless Steel Brewhouse
Description
Mashing Process:Decoction.Infusion.Multi-step infusion
Heating source:Steam,Electric,Gas
SUS304/Red copper
Interior:2.5-3mm
Exteior:3-4mm
Whirlpool Tank
Drying hop port to brew IPA
Dimple Plate Cooling jacket
Carbonation port to fill CO2
HMI
1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available.


2. Professional engineers going abroad for the installation ,debugging, and training, all the travelling cost and
locate food, and hotel shall be afforded by the buyer
3. The installation period is about 15 days including assembling brewing tanks and training the operator. It is
free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended
installation.
4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method
available to the customer.
5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc. should
be installed separately. If needed, cost calculate additionally.
6. Brewing technology, brewing formula, can be offered available
7. More spare parts are available to offered freely.

METO is a professional manufacturer of beer brewing equipment. We mainly have the following kinds of
equipment: including 100L, 200L, 300L, 500L, 1000L, 2000L etc. We can produce the equipment according
to our clients' requirements.


1.Q: Are you a manufacturer?
A: Yes, we have been in providing the professional products in this field for 10 years.
2.Q:What exactly does the 36 month warranty cover?
A:36 month warranty cover all the main tank.one years for the accessories and spare parts.
3.Q: Can your factory produce equipment according to our drawing or samples?
A: Yes, we can do.
4.Q:Is the 15 day set-up by your engineers mandatory, or can we opt to pass on that service?
A:Yes ,you can,we will offer the manual or video to let you know how to connect the equipment.
5.Q: How to calculate the daily output? How many fermenters do I need?
A: Usually theequipment models such as 300L and 500L are only 300L, 500L wort for mashing capacity.
Beer production is according to your fermentation process requirements and the number of fermenters configured.
6.Q: How you pack the products?
A: Normally as the export standard packaging or as you required.
7.Q: What is your available port of shipment?
A: Qingdao port,shanghai etc.